Step 1] A rough estimate can be exchanged on-line.
Submit square footage and product preferences.
Step 2] Arrange an in person apointment,
Contractor takes measurements,
Clients look at sample flake swatches,
Walk through typical construction procedures,
Information walk through ~ QnA
Step 3] Contractor submits a formal project quote
and the bid is agreed upon by the client.
Step 4] Client downpayment 50% of total project.
Contractor purchases Epoxy, Flake, & Supplies.
Preparations made for TBL Coatings to arrive.
(ex. dates set for project, garage emptied...)
Step 5] ~ TBL Coatings arrive On-Site ~
DAY ONE / PREPARATION for Coating
Diamand- blade Concrete Sander / Hand Grinder
Optional: Cracks & Pits Filled for a Seamless Floor
Step 6] Epoxy Coat & Flake applied - allowed for drying
[Residential: step 5 & 6 are typically same day]
Step 7] DAY TWO / FINISH Final Coating
Scrape, Sweep, Vaccuum excess Flake
Roll on Top Coat - Let dry for 24hours
Step 8] Touch Up, Final Payment, and Client move in.