FREE Estimates

Step 1]    A rough estimate can be exchanged on-line.
                Submit square footage and product preferences.
Step 2]    Arrange an in person apointment, 
                Contractor takes measurements,
                Clients look at sample flake swatches, 
                Walk through typical construction procedures, 
                Information walk through ~ QnA

Step 3]    Contractor submits a formal project quote
                and the bid is agreed upon by the client.

Step 4]    Client downpayment 50% of total project.
                Contractor purchases Epoxy, Flake, & Supplies.
                Preparations made for TBL Coatings to arrive.
                (ex. dates set for project, garage emptied...)

Step 5]    ~ TBL Coatings arrive On-Site ~
                DAY ONE / PREPARATION for Coating 
                Diamand- blade Concrete Sander / Hand Grinder
                Optional: Cracks & Pits Filled for a Seamless Floor


Step 6]    Epoxy Coat & Flake applied - allowed for drying
                [Residential: step 5 & 6 are typically same day]

Step 7]    DAY TWO / FINISH Final Coating
                Scrape, Sweep, Vaccuum excess Flake
                Roll on Top Coat - Let dry for 24hours

Step 8]   Touch Up, Final Payment, and Client move in.